Geotechnical Engineering

Newport

In order to subdivide three relatively large parcels of land so that an additional two lots could be created, it was necessary to create an access...

Bobbin Head

The construction of a pedestrian bridge across the upper reaches of Cockle Creek near Bobbin Head NSW, a vital link of the Mangrove Boardwalk...

Newport

Early in the 1960's, a substantial portion of land was subdivided in Belinda Place, Newport against a background of resident opposition that...

Dee Why

The construction of an industrial development over soft ground, and a former swamp area in Dee Why NSW posed significant difficulties and costs...

Palm Beach

The construction of a substantial three-storey residential building on the steeply sloping site above Palm Beach where there were significant land...

Palm Beach, NSW

Between September 2005 & November 2007, SCE were involved in the geotechnical site investigation, footing design and construction inspections...

Earlwood, NSW

In the late 1960s, a conventional three-storey unit development was constructed within a former sandstone quarry in Earlwood.  The quarry face

Newport NSW

In order to subdivide three relatively large parcels of land so that an additional two lots could be created, it was necessary to create an access...